Acushnet Board of Health reorganizes, requires engineer's sign-off on driveway over septic

ACUSHNET — May 5, 2026 — Acushnet Board of Health reorganizes and sends a driveway applicant back for a stamped engineering plan. The board elected David M. Davignon as chairman for the next three years at its May 5 meeting, replacing Robert Medeiros, who stepped down to member; Thomas Fortin was elevated to vice chairman. The board then heard from Chad Walker, owner of 661 Main Street, who wants to build a circular driveway crossing his septic service pipe and running near his leach field. Members said the existing Schedule 40 pipe lacks the depth and durability for vehicle loading and told Walker he must upgrade to Schedule 80 pipe on stone bedding and submit a professionally stamped site plan before any approval will be granted. "I can approve it if it's done right," Davignon said. The board also voted 3-0 to enter executive session on non-union personnel staffing and vacancies, from which it did not return to public session.

Keep reading with a 14-day free trial

Subscribe to Bristol County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Bristol County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe