Mansfield Conservation Commission approves Gilbert Street land disturbance permit
Conservation Commission · Meeting of August 31, 2026
Mansfield Conservation Commission clears six wetlands items after sharp septic debate. Legacy Engineering's Dan American presented a land disturbance permit for Faceoff Holdings LLC's five-home compound on 27.6 acres off Gilbert Street, disturbing about six acres while cutting neighbor-bound stormwater runoff by 20 percent; commissioners approved it 4-0 but forwarded septic-geology concerns to the Planning Board. One commissioner, who described himself as a geologist, warned the site's "ground moraine" soils could cause the consolidated leaching field to fail over time, saying "the problem is the testing method is inadequate to answer the question." Town Engineer Rick Alves won a 4-0 negative determination for a roughly 10,400-foot Gilbert Street water main and drainage overhaul, replacing a break-prone six-inch main with 10,600 feet of new pipe starting next spring.
The commission also approved certificates of compliance for MSS Two Realty, the Bonwood Company and a Cobbler Road pool, plus a three-year order-of-conditions extension for Mike Shunta.
In the full story:
- Who Was There
- Outside parties
- Organizations And Documents Referenced
- The complete report — 3,247 words
Source: the Conservation Commission meeting of August 31, 2026, reported from the official video recording and transcript.
Keep reading with a 14-day free trial
Subscribe to Bristol County News to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news